Built for Industrial Engineers

Garment Line Balancing —
online, built for IEs

Build your operation bulletin, set a target, and get operators per operation, the bottleneck, line efficiency and balance loss in seconds. Save your bulletins to your private company workspace.

Tell us about your factory and we'll set up a trial. Your company data stays private to your company.

Rytplan — Line Balancing
Takt
Shoulder join
0.62
Neck rib attach
0.68
Neck topstitch
0.64
Sleeve attach×2
0.68
Side seam×2
0.70
Sleeve hem
0.71
Bottom hem
Bottleneck0.78
Label attach
0.55
Trim & inspect
0.63
Pack
0.58
10 operations · 12 operators · Efficiency 0.0% · Balance loss 15.1%
Within taktNear taktBottleneck

What you get — allocated cycle time per operation against the takt line, with the bottleneck called out.

How it works

Three steps to a balanced line

11

Enter your operation bulletin

Operations, machine types and SAMs — build it once, save it to your workspace.

22

Set target output & hours

Takt time computes instantly from your target and shift length.

33

Read the balance

Operators per operation, the bottleneck, efficiency and balance loss — in seconds.

Operation bulletin

Enter every operation with its machine type and SAM. Build the full bulletin the way an IE actually works.

Operators per operation

Get theoretical vs allocated manpower for your target output — instantly, with the bottleneck called out.

Line efficiency & balance loss

See balancing efficiency, balance loss %, pitch time and achievable line capacity for the balance you built.

Private & secure

Your data is isolated to your company — no other company can ever see it. Export or delete it anytime.

Balance your first line in minutes

Line Balancing is part of Rytplan — request a trial for your team, and when you're ready to plan the whole factory, it's all one platform.